Thursday, March 12, 2009

Progress Pictures

Sheet Rock, lots and lots of sheet rock. Oh and sheet rock dust. It is covering every square inch of my house. It was done in December and I am sure I will still be seeing sheet rock dust come this December as well.

Floor Patching. This was once an air vent, it now has water pipes going through it. So we thought it wise to cover it up. Yes the cleaner area is the patch, the rest of the floor is covered in...yes you guessed it sheet rock dust.

Tiling. We tiled the new laundry room and two bathrooms. One bathroom has a rather large shower stall that we tiled walls, floor and ceiling. This was the first time the man tackled tiling and I think he did a pretty damn good job. We just had the door measured for a full glass door. Not sure when that is going to be installed, but it's not a big deal since the shower water and drains aren't hook up yet.

Medicine Cabinets and vanities. Two vanities, one for each bathroom and 4 medicine cabinets, one for each sink. They were a royal pain in the ass to install. The man got frustrated with them and I had my dad come help me put them up while the man was at work. That's a fuzzy pic of my mom and I believe maybe my elbow in the mirror.

And last but not least. Toilets. The plumber installed all the valves for the water and the two toilets. No idea when he is going to actually hook the drains up. But that would probably be a good idea to do before the water gets turned on. Otherwise my basement will get really wet...and stinky.

This weekend the trim is supposed to be delivered so the finishing work will be on it's way. I am hoping to be done with everything by the end of the month. However, I am not sure that is actually going to happen. But I have my fingers crossed.


出張ホスト said...


家出 said...


デリバリーホスト said...